How the calculation works
Deliveries = required tonnes ÷ quoted tonnes per delivery, rounded up. Material cost = required tonnes × price per tonne, rounded once to the nearest penny. Delivery cost = deliveries × charge per delivery. Total = material cost + delivery cost.
Use the result with care
The material quantity is not rounded up to fill the final delivery. Your supplier may instead apply minimum quantities, full-load charges or different delivery rates; check the actual quotation. Use the same price basis throughout. This calculation does not infer density, approve a vehicle payload, establish access or unloading arrangements, or assess handling and storage suitability.
Your figures stay in this page
The calculation runs in your browser. These entries are not sent to a calculator service or saved by this tool. Reset returns the form to its starting values.